Grand Canal Harbour – Dublin
Project Facts
Location: Dublin 8
Developer: Marlet
Contractor: Walls
Architects: BKD Architects
Completed: 2024
Unit Type: Apartment
No. Of Units: 596
HPI Facts
HPI Certification No.: 25002
Certification Date: 7/03/2025
HPI Version: HPI V2
Certification Level: Certified
Grand Canal Harbour – Dublin
Grand Canal Harbour in Dublin 8 was developed by Marlet and features 596 homes in a mixed-use development with public spaces. The apartments are a mix of one and two-bedroom homes. Approximately 20% of apartments will be managed by Dublin City Council. Grand Canal Harbour was designed by Burke-Kennedy Doyle Architects.
Internal Water Use: 108 litres / person / day
Regulated Energy Use: Average 38.11 kWh / sqm / annum
Carbon In Use: Centralised Heating
Indoor Air Quality: Part F Commissioned Exhaust Air Heat Pump
Daylighting: Minimum Glazing Standards achieved
Net Space Heat Demand: Average 22.95 kWh / sqm
Flood Risk: No Flood Risk as identified on floodmaps.ie
Airtightness: Average 1.43 (m3 / hr) / m2 @ 50PA q50
Thermal Bridging: fRsi is greater than 0.75 for key junctions
Construction Team: CIRI Registered
Design Team Skills: RIAI Registered Architect
Location Score: 88

